Chemical Weighing System

BioPharma Engineering completed the FES and EPCMV of this project which was designed to allow for the removal of PPE, elimination of manual […]

Secondary Plant High Containment Upgrade

BioPharma Engineering completed the HVAC, building services and electrical design for a new high containment ISO 8 primary and secondary packaging suite of […]

Continuous Manufacturing/ Wet Granulation

BioPharma Engineering was appointed to complete the EPCMV of this project, which was designed to allow for the removal of one of the […]

Secondary Plant - Capacity Upgrade

BioPharma Engineering executed the EPCMV of this project, which was designed to allow for an increase in production of the existing process, and […]

Large Volume Multi-Product Dispensary

BioPharma Engineering completed the detailed design and procurement for a new specialised multi product powder blending facility for a leading pharmaceutical company in […]

Secondary Plant - Waste Treatment Upgrade

BioPharma Engineering completed the detailed design for the upgrade of the waste treatment plant for a leading secondary pharmaceutical plant in Cork.

Pilot Lab Project - Conceptual Design

BioPharma Engineering completed the front end engineering design to develop the basis of design, 10% cost estimate, detailed schedule and supporting documentation to […]

Water Waste Treatment Plant

BioPharma Engineering was appointed for the conceptual study on behalf of a pharmaceutical manufacturing plant for the design, sizing and layout of a […]

Secondary Plant Expansion - HVAC Upgrades

BioPharma Engineering completed the detailed design and procurement for a HVAC upgrade on the existing system for a leading secondary pharmaceutical company based […]

Environmental & WWTP

BioPharma Engineering completed the EPCM for an environmental upgrade area to site, to meet with the client"s requirements.

Mains Water Storage and Distribution System

BioPharma Engineering completed the EP of this design and build project, which was designed to allow for the replacement of the existing site […]

Natural Gas Introduction

BioPharma Engineering completed the estimate, design, construction and commissioning on the introduction of natural gas to site.

Replacement 12 Tonne Boiler

BioPharma Engineering completed the detailed design, construction management and commissioning for a replacement 12 tonne boiler, on behalf of our client.

Fire Water Retention Upgrade

BioPharma Engineering completed the design of an upgraded fire water retention review for a leading Pharmaceutical company.

Secondary Plant - Capacity Expansion

BioPharma Engineering completed the conceptual study for this project which was to allow for incoming resin with salt free material to be eluted […]

Warehouse HVAC Upgrade

BioPharma Engineering completed the detailed design and procurement of heating units for the upgrade of the heating system in API warehouse operations.